Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1560

Inspect the suspect cobra before engineering run

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Component/s: None
    • Labels:
    • Story Points:
      2
    • Sprint:
      PreEngRun05 E, PreEngRun05 G

      Description

      As listed in XML file, there are 36 cobras are flag as "bad" cobras now. Also, we found few cobras constantly going to nowhere during convergence tests. According to our experience in ASRD during AIT phase, re-calibrate those cobra usually helps them get back to healthy. Therefore, a close inspection on those suspect cobra is needed.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                chyan chyan
                Reporter:
                chyan chyan
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: