Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-317

Check DRP 5.0 installation works at IPMU/NAOJ

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: 6.0
    • Component/s: None
    • Labels:
    • Story Points:
      1
    • Sprint:
      2019 B, 2DDRP-2019 C

      Description

      An external check performed by IPMU and NAOJ people should be done to check that the 2D DRP pipeline runs as expected.

      This check would involve the:

      • installation and
      • running of the integration test script

      at the local institution.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                kiyoto.yabe Kiyoto Yabe
                Reporter:
                hassan hassan
              • Votes:
                0 Vote for this issue
                Watchers:
                6 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: