Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-1460

run17 initial calib analysis

    XMLWordPrintable

    Details

      Description

      Perform the initial analysis on the calibs and determine if we need new DMs (we do) and then evaluate the new DMs.

       

      Attached is the initial analysis of the new DMs. 

       

      The individual files are all saved in /work/wtg/2024-05-30/01

       

      These new DMs were approved on 2024-05-30 and installed to /work/drp/CALIB before the start of observations that night.

        Attachments

          Activity

            People

            • Assignee:
              wtgee Wilfred Gee
              Reporter:
              wtgee Wilfred Gee
              Reviewers:
              Kiyoto Yabe
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: