Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-1454

Update PFS stack to depend on current LSST stack.

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Sprint:
      Gen3 transition

      Description

      We would like to be compatible with current LSST development, especially the Gen3 butler and task planning and orchestration. This is a ticket for that (I think we have only slack'ed discussion so far). Can I propose that we switch over shortly after the end of the second 2024-05 engineering run, which ends on June 4?

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                price price
                Reporter:
                cloomis cloomis
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: