-
Type:
Task
-
Status: Done (View Workflow)
-
Priority:
Normal
-
Resolution: Done
-
Component/s: ics_agccActor
-
Story Points:5
-
Sprint:EngRun3Cleanup
Update and test the centroiding routine for the agcc actor, write the results to the DB.
- relates to
-
INSTRM-1412 Integrate multiple centroiding methods in agcc
-
- Done
-
-
INSTRM-1008 Design and create operational database tables for A&G camera exposures
-
- Done
-
-
INSTRM-1379 Integrate agccActor to opDB
-
- Won't Fix
-