-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: None
-
Labels:
-
Story Points:3
-
Sprint:SM1PD-2020 G2, SM1PD-2020 H
It would be useful to note mechanical changes which could affect data reduction. The obvious parts are the FPA motors, the slit hexapod, and the red exchange mechanism.
The proposed mechanism is to have per-SM counters which are incremented when moves are made. Some listener, in the icc or alerts actors, will listen to keywords and will increment an opdb table. The value in that table will be added to the headers so that DRP can know whether exposures were taken with possibly different configurations.
FPA moves and the red exchange mechanism affect only a single camera, so perhaps there should be 12 counters. We do not expect to move FPAs very often, but the rexm will be.
- relates to
-
INSTRM-1054 Provide logic for processing SM1 calibration data
- Done
-
INSTRM-1035 Add fpaMoved keyword
- Done
-
INSTRM-1036 Generate hexapodMoved, gratingMoved at end of hexapod, rda move
- Done
-
INSTRM-1064 Add hardware-moved cards and keywords to ccd/hx actors.
- Done
-
INSTRM-1068 add beamConfigDate column to sps_exposure table
- Done