Type: Story
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: None
-
Labels:
-
Sprint:2DDRP-2021 A
This ticket describes a summary of the end-to-end processing test to confirm that the process from 2D-DRP (without Mineo-san's system) to 1D-DRP can be done. The target data is the existing 2D simulated images with a certain set of template galaxy and star iput spectra.
- blocks
-
PIPE2D-605 DRP end-to-end processing test
- In Progress
- is blocked by
-
INFRA-278 Install 2D-DRP & 1D-DRP on a server at IPMU
- Done
-
PIPE1D-14 Run 1D-DRP for the resulting products from 2D in the end-to-end processing test
- Done
-
PIPE2D-606 Run test scripts for the end-to-end processing test
- Done
-
PIPE2D-607 Run 2D-DRP for the existing simulated 2D image
- Done
-
PIPE2D-644 Create NIR simulated data and run the end-to-end test including NIR data
- Done
-
SIM2D-127 Run 2D simulator for the end-to-end processing
- Done