-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: None
-
Labels:
-
Sprint:2DDRP-2021 A
For the first step of the end-to-end processing test, run 2D-DRP for the existing simulated 2D image.
- blocks
-
PIPE2D-608 Confirm that 2D-DRP products can be passed to 1D-DRP
- Done
- is blocked by
-
INFRA-278 Install 2D-DRP & 1D-DRP on a server at IPMU
- Done