Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-1533

Plan for data acquisition in Aug 2024 engineering run (run18)

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
    • Sprint:
      EngRun18August

      Description

      (to be updated)

      (upper is higher priority)

      • The calibration data we regularly take
        • masterBiases
        • masterDarkes
        • IIS Bootstrap (check detectorMap using IIS)
        • Arc/Trace to make detectorMap
      • fiberProfiles
      • Trace at least every morning/evening (in mid night as well if possible)

        Attachments

          Activity

            People

            • Assignee:
              Unassigned
              Reporter:
              kiyoto.yabe Kiyoto Yabe
            • Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: