Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-1473

bad flux calibration in GE visits

    XMLWordPrintable

    Details

    • Sprint:
      postRun17, preRun18August1, EngRun18August, PostRun18, preRun19Oct2024, postRun19Oct, preRun20Jan

      Description

      rhl pointed out the flux calibration is catastrophically bad in GE visits. I am filing this ticket as per Mortani-san's request.

       

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                Unassigned
                Reporter:
                msyktnk Masayuki Tanaka
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: