Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-448

Write AIT command to check basic SAM, cable, and ASIC liveness.

    XMLWordPrintable

    Details

      Description

      The SAM is installed into a cryostat feedthrough box. That needs to be done very early on, after which the DAQ chain gets split up. We need to bundle the basic SAM+ASIC sanity tests (voltages ok? images sane? Number of channels right? etc.) into a single command which can be run on the test bench, with the custom cable, the ASIC, and the ROIC.

      We have all the low-level commands to query things: we just need to put those into an actor command (or a few).

        Attachments

          Activity

            People

            • Assignee:
              cloomis cloomis
              Reporter:
              cloomis cloomis
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated: