-
Type: Task
-
Status: Open (View Workflow)
-
Priority: Normal
-
Resolution: Unresolved
-
Component/s: ics_hxActor
-
Labels:None
The SAM is installed into a cryostat feedthrough box. That needs to be done very early on, after which the DAQ chain gets split up. We need to bundle the basic SAM+ASIC sanity tests (voltages ok? images sane? Number of channels right? etc.) into a single command which can be run on the test bench, with the custom cable, the ASIC, and the ROIC.
We have all the low-level commands to query things: we just need to put those into an actor command (or a few).