-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: pfs_utils
-
Labels:
-
Sprint:EngRun18August, PostRun18
Subaru_POPT2_PFS.py was modified just before the run to change FK5 to ICRS, to align to theĀ uploaded target list (INSTRM-2352). However, the configured fiber was far away from the targets. Fix it.