-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: ics_iicActor
-
Labels:
-
Story Points:1
-
Sprint:EngRun16May
Because one GANG connector won't be connected to SM2, we need to illuminate Cable B to run the relevant Cobras. As we did in July 2023 we need to use Cable B illuminator, whose power was controlled by PDU of DCB1.