Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-2248

Re-activate cable B illuminator

    XMLWordPrintable

    Details

    • Story Points:
      1
    • Sprint:
      EngRun16May

      Description

      Because one GANG connector won't be connected to SM2, we need to illuminate Cable B to run the relevant Cobras. As we did in July 2023 we need to use Cable B illuminator, whose power was controlled by PDU of DCB1.

        Attachments

          Activity

            People

            • Assignee:
              arnaud.lefur arnaud.lefur
              Reporter:
              yuki.moritani yuki.moritani
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: