-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: None
-
Labels:
-
Story Points:2
-
Epic Link:
-
Sprint:2019 B
The Hexapod of the slit is supposed to be power off and be on only when we need it.
so we need to implement a such mechanism to do that without redoing a init/homing each time.
- is blocked by
-
INSTRM-555 Implement remote power control for enu devices
- Done