Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1572

Testing cobra geometry algorithm and scripts

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Component/s: None
    • Labels:
    • Sprint:
      PreEngRun05 F, PreEngRun05 G

      Description

      In the past few weeks, we have done two implementation for cobra.

      1. Removing unstable FF for more accuracy transformation for cobra centers determinations (L1/L2)
      2. Updating cobra algorithm to avoid the dot locations.

      Since those activities are settled, we should test those code, scripts and algorithm on bench as a preparation for coming observation run.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                chyan chyan
                Reporter:
                chyan chyan
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: