Just before observing a pfsDesign, we will know the real telescope altitude, etc. We need a routine which finalizes the positions in a given pfsDesign. It cannot change the SHA, so cannot modify ra/dec assignments.
- relates to
-
INSTRM-1609 Calculate fibre positions in mm just before observing field
- Done
-
INSTRM-1618 update opdb schema to cope with the new pfsDesign finalize logic
- Won't Fix
-
INSTRM-1569 Have ICC "finalize" pfsDesign on load.