Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1569

Have ICC "finalize" pfsDesign on load.

    XMLWordPrintable

    Details

    • Sprint:
      PreEngRun05 G, PreEngRun06June

      Description

      pfsDesigns are generated for some sky position at some hour angle/altitude/airmass. When we use a design (nominally by gen2 calling iic moveToPfsDesign), we will know the actual altitude, and need to adjust the cobra positions to match. So iic should call some routine to do so.

      We need a pfs_utils routine to finalize a pfsDesign given some altitude and iic needs to call it. That routine cannot change ra/decs (and thus the SHA).

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                cloomis cloomis
                Reporter:
                cloomis cloomis
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: