Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: ics_xcu_fee
-
Labels:
[ I thought I had filed this earlier but apparently not. ]
The LBNL wipe routine is believed to ameliorate the tearing seen in INSTRM-7. We have a been using an external loop which is slow. Implement an internal routine instead. Specifically:
- Push parallels up to some newly specified voltage
- Ramp Vbb down to zero volts at a specified rate
- Dwell for 0.5 seconds
- Ramp Vbb back up to its original voltage at the same rate
- When Vbb reaches a defined threshold, drop the parallels to their original value
- Continue ramping Vbb
So command like:
~SEQ,[ramp_time_ms],[threshold],[parallel voltage]
- relates to
-
INSTRM-1556 Call new internal FEE routine for erasing
- Done
-
INSTRM-7 CCD flats show regions of vertical structure from top of detector
- Done