[SIM2D-70] Merge in data from 2016-12 first light on r1. Created: 10/Dec/16  Updated: 30/May/18  Resolved: 30/May/18

Status: Done
Project: DRP 2-D Simulator
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Major
Reporter: cloomis Assignee: Unassigned
Resolution: Done Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified


 Description   

We have actual flats and arcs through dewar and some central optics. Classify and incorporate.



 Comments   
Comment by cloomis [ 13/Dec/16 ]

Ingested to /tigress/HSC/PFS/LAM/.

Notes:

  • exposure times for non bias/dark exposures are 0
  • biases 160..170 (the ones right before the darks probably have more light leaks)
  • pretty good darks 148..152 (shutter closed, cleanroom lights off, instrument covered). But there will be light from stray LEDs in the cleanroom.
  • No flats as of 2016-12-12, either imaging or dithered. We could pull in the JHU imaging flats, but the vignetting will be completely different.
  • I'll edit in the spectral flat and arc exposure ids.
Comment by cloomis [ 30/May/18 ]

Old data.