[PIPE2D-791] Stability tests: separate visits into calibration and 'science' Created: 23/Mar/21  Updated: 13/Jan/22

Status: Open
Project: DRP 2-D Pipeline
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: hassan Assignee: arnaud.lefur
Resolution: Unresolved Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Blocks
is blocked by PIPE2D-794 Review recent stability data Open
Relates
relates to PIPE2D-706 Regular processing of arcs, flats Done
Story Points: 2
Sprint: 2DDRP-2021 A3, 2DDRP-2021 A 4, 2DDRP-2021 A5, 2DDRP-2021 A 6, 2DDRP-2021 A 7, 2DDRP-2021 A 8, 2DDRP-2021 A 10

 Description   

Introduce a scheme such that during automatic processing of calibration data a set of visits are held back.

These held-back data are used to mimic science observations and validate the quality of the calibration products.



 Comments   
Comment by rhl [ 24/Mar/21 ]

It sounds as if this overlaps with the work we gave arnaud.lefur to examine the stability data and make sense of it.

Comment by hassan [ 24/Mar/21 ]

Following yesterday's Princeton Group telecon, I planned to file a new ticket on arnaud.lefur to go through the stability data, make sense of it, and identify 'good' visits that we can use for automatic processing. Then this current ticket would take those 'good' visits and divide it into to those used for generating calib products, and those used to as 'science' to check the quality of the stability data and processing. Both tickets can be assigned to Arnaud.

Does that make sense?

Generated at Sat Feb 10 15:58:06 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.