[PIPE2D-1218] Check the repeatability of DCB defocused images before and after re-connecting the cables Created: 12/May/23  Updated: 22/May/23

Status: Open
Project: DRP 2-D Pipeline
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: Kiyoto Yabe Assignee: Kota Hayashi
Resolution: Unresolved Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Attachments: PDF File repeatability.pdf    
Issue Links:
Relates
relates to PIPE2D-1152 Verify shape of DCB donuts with fresh... In Progress

 Description   

Remove the DCB fiber cables and connect them again. Compare the illumination pattern just before and after that reconnection. (before) visit=93897..93899 (after) visit=93900..93905.



 Comments   
Comment by Kota Hayashi [ 12/May/23 ]

Flux difference between 'before' and 'after' DCB defocus images.

repeatability.pdf

Comment by Kiyoto Yabe [ 22/May/23 ]

Thank you. I guess the visit number (of reference frame) on the right plot is not 98399 but 93899? The range to show looks +/- 0.5 max but the maximum of what (the count of defocus image or the count of entire frame including CR)?

Generated at Sat Feb 10 16:04:23 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.