[PIPE2D-1108] Standard stars for November 2022 engineering run Created: 04/Nov/22  Updated: 08/Feb/23  Resolved: 30/Nov/22

Status: Done
Project: DRP 2-D Pipeline
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: Takuji Yamashita Assignee: Takuji Yamashita
Resolution: Done Votes: 0
Labels: EngRun, flux-calibration
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Relates
relates to PIPE2D-1022 Plan for flux calibration test of May... Done
relates to PIPE2D-1075 Standard stars for September 2022 eng... Done
Sprint: 2DDRP-2023 A
Reviewers: hassan

 Description   

Update the target list of standard stars for the engineering run. The targets of the September run are reused, but some new DA objects are added. 



 Comments   
Comment by hassan [ 30/Nov/22 ]

Takuji Yamashita can we close this ticket?

Comment by Takuji Yamashita [ 30/Nov/22 ]

Yes, we can close it. The pfsDesign files were generated. 

Generated at Sat Feb 10 16:02:54 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.