[PIPE2D-1076] Add CR check to weekly build Created: 09/Sep/22  Updated: 09/Sep/22

Status: Open
Project: DRP 2-D Pipeline
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: hassan Assignee: price
Resolution: Unresolved Votes: 0
Labels: QualityAssurance
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Story Points: 1

 Description   

As discussed today in the slack #drp-2d channel: add a check in the weekly such that if the cosmic ray counts for a reference set of visits exceeds that of the expected value significantly (ie by some percentage or sigma), raise a warning.

This check should be done separately for b and r exposures.



 Comments   
Comment by rhl [ 09/Sep/22 ]

This should be done as part of a wider program of QA on weekly runs.  Is there a ticket describing the system that we plan to use?  Where are the failures reported, and how?  With what plots? etc.

Generated at Sat Feb 10 16:02:25 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.