[INSTRM-952] Write SPS software test case document for migration post SM1 AIT Created: 16/Apr/20  Updated: 30/May/20  Resolved: 30/May/20

Status: Done
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Story Priority: Normal
Reporter: hassan Assignee: hassan
Resolution: Done Votes: 0
Labels: SPS
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Relates
relates to INSTRM-769 Update SPS-SW-TestCases document Done
Story Points: 4
Sprint: SM1PD-2020 G

 Description   

At the end of the SM1 AIT test campaign performed by the LAM team at Subaru, the SPS ICS software will be migrated to make use of the IIC actor and opDB.

Using the pre-shipping SM1 test case document as a basis, write a new document that enables:

1. Validation of the spsait software system before migration (to ensure that we are ready to migrate)
2. Validation of the migrated software system (to ensure that the migrated system is correctly implemented and that SM1 is functioning as expected).



 Comments   
Comment by hassan [ 30/May/20 ]

Skeleton completed.