[INSTRM-872] Feature request: limit realtime plot length? Created: 07/Jan/20  Updated: 17/Jan/20  Resolved: 17/Jan/20

Status: Done
Project: Instrument control development
Component/s: ics_sps_engineering_plotData
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: cloomis Assignee: arnaud.lefur
Resolution: Done Votes: 0
Labels: SPS
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Sprint: SM1PD-2020 A

 Description   

We often leave some plot tools running essentially forever: temperature & pressure, etc. But the plots bog down badly after a while (week? two?). Could the data buffer for the "realtime" plots be clipped to some maximum time stretch?


Generated at Sat Feb 10 16:29:31 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.