[INSTRM-778] Post-delivery, pre-operations SM1 changes at Subaru. Created: 26/Sep/19  Updated: 05/Aug/20  Resolved: 16/Jul/20

Status: Done
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: cloomis Assignee: cloomis
Resolution: Done Votes: 0
Labels: SPS
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Blocks
is blocked by INSTRM-522 Move date/time and frame card creatio... Done
is blocked by INSTRM-789 Add "sps expose" command to iicActor,... Done
is blocked by INSTRM-831 Re-layer /data usage for MCS and SPS. Done
is blocked by INSTRM-862 Add single mechanism for sub-actors t... Done
is blocked by INSTRM-863 Finish providing all Gen2 info as MHS... Done
is blocked by INSTRM-864 Create Gen2 entrypoints for *publishe... Done
is blocked by INSTRM-865 Create Gen2 entrypoints for *engineer... Done
is blocked by INSTRM-866 Convert spsaitActor, etc. experiment/... Done
is blocked by INSTRM-931 adapt sequencing engine from spsait Done
is blocked by INSTRM-933 Migrate LAM spsAitCommands to the Sub... Done
Relates
relates to INSTRM-800 Change pfs and pfs-data user/group ID... Done
relates to INSTRM-801 Move the LAM ics_dnsmasq MAC files to... Done
relates to INSTRM-802 Add tables for SPS AIT to the Subaru ... Done
relates to INSTRM-803 Install enuActor and all sps actors a... Done
relates to INSTRM-804 Provide STS the datum [ID, name, help... Done
relates to INSTRM-805 Install and wire in rough1 ics_roughA... Done
relates to INSTRM-813 install drpActor at Subaru Done
relates to INSTRM-779 Set up roughing actor at Subaru Done
relates to INSTRM-806 Provision rack5-ics host Done
relates to INSTRM-780 Add pfs-data account at Subaru. Won't Fix
relates to INSTRM-588 Add pfs-data account at Subaru Done
Story Points: 4
Sprint: SM1PD-2019 A, SM1PD-2019 B, SM1PD-2019 C, SM1PD-2019 D, SM1PD-2019 E, SM1PD-2020 A, SM1PD-2020 B, SM1PD-2020 C, SM1PD-2020 D, SM1PD-2020 G, SM1PD-2020 E, SM1PD-2020 F

 Description   

There are a few things we will need to do before SM1 can/should be run at Subaru. Some will merit their own tickets, but I'll start with a text list. In rough order of time requirement.

1. Before we can acquire data:

  • add pfs-data account at Subaru – that is the account which is used to write image files. (Done, INSTRM-588)
  • change pfs and pfs-data user/group IDs on BEEs to match the Subaru LDAP numbers. (Done, INSTRM-800)
  • move the LAM ics_dnsmasq MAC files to the Subaru directory; make sure names are there. (Done, INSTRM-801)
  • add tables for SPS AIT to the Subaru opdb.
  • install enuActor and all sps actors and programs. [Can probably run anywhere] (Done, INSTRM-806 INSTRM-816, INSTRM-803)

2. Before we can run cold:

3. Before we can call the instrument Subaru-compliant:

  • change image locations to INSTRM-823 compliant /data/raw/YYYYMMDD/sps/ directories (INSTRM-831 +)
  • change visit source from LAM's seqnoActor to gen2Actor/iicActor (INSTRM-862)
  • wire in gen2 headers (INSTRM-863, INSTRM-466 (done))
  • switch to iicActor control of the spsActor (top-level call in spsActor already exists) (INSTRM-789)
  • adapt sequencing engine from spsait (INSTRM-931)
  • migrate spsait commands to iicActor (INSTRM-933)
  • add Gen2 .sk, etc for published IIC functions for SPS. (INSTRM-864)
  • add Gen2 .sk, etc for engineering SPS functions (sps expose, etc). (INSTRM-865)
  • convert spsaitActor, etc. to use the obDb visitSet, etc. tables for experiment/exposure logs. (INSTRM-866)

In that last group, some tickets must be closed before we can archive FITS files: INSTRM-831, INSTRM-862, INSTRM-863



 Comments   
Comment by cloomis [ 02/Oct/19 ]

pfs-data account was done a while back, INSTRM-588

Comment by hassan [ 07/Nov/19 ]

Following discussions between cloomis, arnaud.lefur and hassan 2019-11-06: CPL will revise the ordering of pre-operation steps listed in the description section.

Comment by cloomis [ 19/Dec/19 ]

Updated main description with ticket numbers and ticket status. As of 2019-12-18 (the end of the 2019 SM1 integration wrk at Subaru) I believe it captures what was done and what needs to be done by the end of 2020-01.

Comment by hassan [ 16/Jul/20 ]

All child tickets completed. Tickets INSTRM-864 and INSTRM-865 where added to the description, but following subsequent discussions considered outside the scope of this work.