[INSTRM-618] start ionpumps one by one Created: 27/Feb/19 Updated: 21/May/19 Resolved: 21/May/19 |
|
| Status: | Done |
| Project: | Instrument control development |
| Component/s: | ics_xcuActor |
| Affects Version/s: | None |
| Fix Version/s: | None |
| Type: | Task | Priority: | Normal |
| Reporter: | fmadec | Assignee: | cloomis |
| Resolution: | Done | Votes: | 0 |
| Labels: | SM1 | ||
| Remaining Estimate: | Not Specified | ||
| Time Spent: | Not Specified | ||
| Original Estimate: | Not Specified | ||
| Description |
|
when we start the 2 ionpumps at the same time, it outgassed and the pressure level reach a high level (~6 10-4 Torr). So I would like to (at least test) have a way to start them one by one. We could then set a duration between the 2 starts in the code. what do you think? |
| Comments |
| Comment by cloomis [ 21/May/19 ] |
|
merged at 912b817, tagged 1.8.3 Added pump1/2 command options: ionpump on [@pump1] [@pump2]. Also for off. If neither specified both are controlled. |