[INSTRM-52] [xcuActor] Split out roughing pump and ion gauge into new roughingActor Created: 27/Dec/16  Updated: 25/May/18  Resolved: 25/May/18

Status: Won't Fix
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Major
Reporter: cloomis Assignee: shimono
Resolution: Won't Fix Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Duplicate
duplicates INSTRM-8 Move roughing pump and gauge control ... Done

 Description   

This issue was initially filed into JIRA by 'cloomis' at 01/Oct/15 3:40 PM as ICS-14.
This issue was assigned to 'Steve Hope'.

The xcuActor currently controls a roughing pump and queries an ion gauge on the manifold between that pump and the turbo.

We will have two of these "roughing stations", backing up twelve xcuActors, and the roughing devices will be turned off most of the time. It makes sense to pull the control out of the xcuActor.

As long as we are only controlling one dewar (i.e. 2015Q3 work at JHU and LAM), this is not important.



 Comments   
Comment by arnaud.lefur [ 18/May/17 ]

As long as we are only controlling one dewar (i.e. 2015Q3 work at JHU and LAM), this is not important.

We have two dewars now connected to one roughing station, cloomis should that be considered important now ?

Comment by cloomis [ 19/May/17 ]

Do you have Pfeiffers on the roughing side?

Comment by arnaud.lefur [ 20/May/17 ]

We have one Pfeiffer gauge on the roughing which is read by xcu_r1 .

Comment by cloomis [ 25/May/18 ]

Covered by INSTRM-8

Generated at Sat Feb 10 16:21:00 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.