[INSTRM-231] Design a GUI prototype for sps Created: 13/Oct/17  Updated: 20/Dec/18  Resolved: 19/Dec/18

Status: Done
Project: Instrument control development
Component/s: ics_spsClient
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: arnaud.lefur Assignee: arnaud.lefur
Resolution: Done Votes: 0
Labels: SM1
Σ Remaining Estimate: Not Specified Remaining Estimate: Not Specified
Σ Time Spent: Not Specified Time Spent: Not Specified
Σ Original Estimate: Not Specified Original Estimate: Not Specified

Issue Links:
Relates
relates to INSTRM-248 Create and structure project + basic ... Done
relates to INSTRM-250 Dynamically generate and update a dat... Done
relates to INSTRM-253 Create Viscu class for visible camera... Done
relates to INSTRM-254 Create Enu class to handle enu widget Done
relates to INSTRM-265 List and describe meta keywords for sps Won't Fix
Sub-Tasks:
Key
Summary
Type
Status
Assignee
INSTRM-399 add dcbActor detailed control panel Sub-task Done arnaud.lefur  
INSTRM-416 add slit detailed control panel Sub-task Done arnaud.lefur  
INSTRM-456 add rexm detailed control panel Sub-task Done arnaud.lefur  
INSTRM-457 add bsh detailed control panel Sub-task Done arnaud.lefur  
INSTRM-463 add motors detailed control panel Sub-task Done arnaud.lefur  
INSTRM-471 add gauge detailed control panel Sub-task Done arnaud.lefur  
INSTRM-472 add gatevalve detailed control panel Sub-task Done arnaud.lefur  
INSTRM-473 add turbo detailed control panel Sub-task Done arnaud.lefur  
INSTRM-474 add cooler detailed control panel Sub-task Done arnaud.lefur  
INSTRM-475 add fee detailed control panel Sub-task Done arnaud.lefur  
INSTRM-487 add monochromator detailed control panel Sub-task Done arnaud.lefur  
Story Points: 20
Epic Link: Red channel alignment

 Description   

As SM1 is coming soon, it has been decided that now is a good time to work on a GUI prototype for the whole spectrograph system.

There is already an existing software that is used for one channel that can be used as a foundation for what's coming next.

The framework used will be pyqt5.



 Comments   
Comment by arnaud.lefur [ 13/Oct/17 ]

shimono
Can you create a new github repository for that piece of code.
I'm not sure yet about the name ...
ics_spsClient ? If you have a better idea please propose something.

Comment by shimono [ 13/Oct/17 ]

https://github.com/Subaru-PFS/doc/blob/master/development-management/request.rst#add-new-github-repository

Comment by hassan [ 06/Jul/18 ]

arnaud.lefur: does this ticket need to be divided into sub-tasks as you/Fabrice mentioned during the SpS/ICS phonecon yesterday?

Comment by arnaud.lefur [ 06/Jul/18 ]

Yes, I've created INSTRM-399 which is actually a sub-task of INSTRM-231, but I realize that I haven't put any link to it.

So how do we do that ? we set INSTRM-399 as blocking for INSTRM-231 ?

Comment by hassan [ 06/Jul/18 ]

I think I've done it for you. I could not see any other solution but to use the bulk change feature on a single issue:

https://community.atlassian.com/t5/Jira-Core-questions/How-Can-I-convert-two-or-more-tasks-in-sub-task/qaq-p/288572

Comment by hassan [ 06/Jul/18 ]

Sorry, a more obvious approach would have been to select More->Convert to sub-task from the menu at the top of the issue.

Comment by arnaud.lefur [ 07/Jul/18 ]

Ok, thank you. I'll try to do it cleanly next time

Comment by hassan [ 19/Dec/18 ]

Following SpS breakout meeting during CM10 Shanghai Dec 2018, agreed that this ticket can be resolved. Only one related ticket, INSTRM-265, is not closed. This will be resolved as part of the usual SM1 planning.

Generated at Sat Feb 10 16:22:52 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.