[INSTRM-2142] Cobra Optimization: analyzing the cobra step numbers from past convergence run Created: 11/Jan/24 Updated: 24/Jan/24 |
|
| Status: | Open |
| Project: | Instrument control development |
| Component/s: | None |
| Affects Version/s: | None |
| Fix Version/s: | None |
| Type: | Task | Priority: | Normal |
| Reporter: | chyan | Assignee: | chyan |
| Resolution: | Unresolved | Votes: | 0 |
| Labels: | EngRun | ||
| Remaining Estimate: | Not Specified | ||
| Time Spent: | Not Specified | ||
| Original Estimate: | Not Specified | ||
| Sprint: | PreEngRun15Mar |
| Description |
|
The cobra FPGA takes five seconds for iteration > 3. However, we can limit the step numbers to enhance the speed. Before applying the change, we need to know the optimal number for each iteration. |