[INSTRM-2087] Make the default ion pump distribution across controllers BRN/BRN Created: 26/Oct/23  Updated: 26/Oct/23  Resolved: 26/Oct/23

Status: Done
Project: Instrument control development
Component/s: pfs_instdata
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: cloomis Assignee: cloomis
Resolution: Done Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified


 Description   

Each cryostat's ion pumps are currently assigned to the two 4UHV controllers in arm order, with BB and RR on one controller, and NN on the second.

In order to be more resilient in the face of controller failures, change that to put all the first BRN pumps on one controller and the second BRN on the other.

This change will require physically connecting and starting up the controllers to match. Note that there is no way to tell whether the pump which an xcuActor connects to is the right one for that cryostat.



 Comments   
Comment by cloomis [ 26/Oct/23 ]

Tagged 1.7.13.

Generated at Sat Feb 10 16:42:52 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.