[INSTRM-20] Update SSN-00005 for recent upgrade of Subaru/CB2F UPS Created: 18/Nov/16  Updated: 20/Feb/23  Resolved: 20/Feb/23

Status: Won't Fix
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Major
Reporter: shimono Assignee: Unassigned
Resolution: Won't Fix Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified


 Description   

Recently Subaru/CB2F UPS system has upgraded, and now we have 2 UPS-ed power lines to CB2F instrument control computers, which can supply about ~30-40min after power failure but without DG backup.



 Comments   
Comment by Philip Tait (Disabled - local account) (Inactive) [ 18/Nov/16 ]

Note that our standard practice is to connect dual power supply servers to each UPS, so that likelihood of downtime is minimised (e.g. if a UPS fails, or is powered-down during routine maintenance). Equipment that cannot be configured with dual power supplies should be powered from a transfer switch in the rack.

Comment by shimono [ 26/Jul/17 ]

From discussion on week of 2017/07/17 at Subaru, we agreed we need to explore current configuration and situation at Subaru including notification under Gen2 (e.g. Gen2 only receives signal from their own UPS), and we need to find Subaru-wide solution to notice power failure to instruments (OBCPs).
Also we agreed we need to find solution to notice status of power transfer switch (commercial or DG) to PFS/SpS, while PFS CB2F switches are offline, especially to notice whether 2nd power outage detected at PFS SpS UPS is DG drained out or second time of commercial power outage.