[INSTRM-1949] April convergence performance study Created: 26/Apr/23  Updated: 04/Aug/23  Resolved: 04/Aug/23

Status: Done
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: chyan Assignee: chyan
Resolution: Done Votes: 0
Labels: EngRun
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Attachments: PNG File 1.png     Microsoft PowerPoint aprRunStudy.pptx     Microsoft PowerPoint aprRunStudy.pptx    
Issue Links:
Relates
relates to INSTRM-1953 Fix convergence problem of 92009 Done
relates to INSTRM-1970 Study the specific convergence run vi... Done
relates to INSTRM-1974 Study the strange convergence results... Done

 Description   

Some convergence run in April show very strange behavior in the last few iteration. Need to look into that. See the attached plot



 Comments   
Comment by chyan [ 23/Jun/23 ]

Updating the ticket by uploading the slides I presented in the meeting. We have some idea on how to improve and will keep updating this ticket.

Generated at Sat Feb 10 16:41:20 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.