[INSTRM-1921] Punch list for Run 11 (April 2023) Created: 14/Apr/23  Updated: 11/May/23  Resolved: 11/May/23

Status: Done
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: yuki.moritani Assignee: Unassigned
Resolution: Done Votes: 0
Labels: EngRun
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Sprint: PreEng11Apr1

 Description   
  • Tag software, implement to the summit and make sure each use the same version (Le Fur, Loomis, Yan, Yoshida)
    • Make sure peb actor uses default configuration (Yan)
    • MCS: reconfigure actor for real MCS (Yan)
  • PFSA and PFSF FITS header (INSTRM-1441, INSTRM-1790, INSTRM-1766 etc.) (Loomis)
    • Archive test before the run (TBC)
  • AG operation database update (INSTRM-1920, INSTRM-1892 etc.)
    • Test using AG simulator (Yoshida, Karr)
  • Cobra incremental movement (INSTRM-1809) and smaller circle for geometry (INSTRM-1834)
    • test on US (Yan)
  • Confirm CALIB set initially used (Le Fur, Price)
  • Gen2 command test (Koshida, Takagi, Arai)
  • Take MCS/AG/SpS data
  • confirm book-keeping is correct for N arm (INSTRM-632, INSTRM-1883), (Loomis, Le Fur)
  • N1 defect map (Loomis)
     


 Comments   
Comment by yuki.moritani [ 11/May/23 ]

The April run is over, so I close this ticket. Almost all the items were done before or beginning of the run.