 Description   

The NIR SN3 FPA Mangin is being moved to better center the FPA. Once that has been done and the cryostat recooled we need to check the image quality. So retake the spot grid.

If the gimbalator is put back where it was (which has happened in the past) this should be quick – ~1 hour of my time to test the alignment, ~12 hours in the background to run the acquisition, and ~2 hours of my time to reduce it and generate the pretty outputs. Add an hour or two at the start if the gimbalator is off, and/or extra time at the end if the new spots do not meet specs.



 Comments   
Comment by cloomis [ 21/Jun/23 ]

Done. The gimbalator did not go back as hoped.