[INSTRM-19] Add detailed design of pipe/manifold of glycol line into SE-IPMU-00016 Created: 18/Nov/16  Updated: 20/Feb/23  Resolved: 20/Feb/23

Status: Won't Fix
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Major
Reporter: shimono Assignee: Unassigned
Resolution: Won't Fix Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified


 Description   

[FROM Discussion at 2016/09/22 b/w Subaru and PO]

Develop detailed design of pipe/manifold of glycol line, such as selection of pipe diameter, possible implementation of manifold around SM bench (incl. rough idea of access from outside SM to connection points), and detailed design on telemetry measurement.
Update SE-IPMU-00016 document with these information. Also refer SE-IPMU-00001 for chiller and pipe design.


Generated at Sat Feb 10 16:20:40 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.