[INSTRM-1793] Study the cobra geometry of Nov E-run Created: 17/Nov/22  Updated: 16/Dec/22  Resolved: 16/Dec/22

Status: Done
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: chyan Assignee: chyan
Resolution: Done Votes: 0
Labels: EngRun
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Attachments: PDF File cobraGeometry20221204.pdf    
Story Points: 2
Sprint: PreEngRun09Dec

 Description   

In Nov run, we run the cobra geometry during the day time with help from day crew on 11/15, 16 with EL90, EL60. This ticket address the need of analysis of those geometry data.



 Comments   
Comment by chyan [ 16/Dec/22 ]

As we see from the analysis, there are some systematic changes of cobra centers. However, the arm lengths are pretty consistent. We have agree to make another measurement in Dec run to make sure the consistency of the cobra centers.

Generated at Sat Feb 10 16:39:31 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.