[INSTRM-1781] Punch list to start the engineering run in November 2022 Created: 05/Nov/22 Updated: 08/Feb/23 Resolved: 30/Nov/22 |
|
| Status: | Done |
| Project: | Instrument control development |
| Component/s: | None |
| Affects Version/s: | None |
| Fix Version/s: | None |
| Type: | Task | Priority: | Normal |
| Reporter: | yuki.moritani | Assignee: | Unassigned |
| Resolution: | Done | Votes: | 0 |
| Labels: | EngRun | ||
| Remaining Estimate: | Not Specified | ||
| Time Spent: | Not Specified | ||
| Original Estimate: | Not Specified | ||
| Sprint: | 2DDRP-2023 A |
| Description |
|
Here is a test and check list for software updates before coming the engineering run (2022/11/14-20). Note that all the software should be tagged and implemented at the summit/Hilo system.
After POpt2 installed (i.e. the beginning of the run), the following items can be tested:
|
| Comments |
| Comment by rhl [ 05/Nov/22 ] |
|
We need to add taking a full set of calibrations, reducing them, checking them, and ingesting them in the usual place |
| Comment by yuki.moritani [ 05/Nov/22 ] |
|
Yes, but calibrations using pfilamp can be taken only after PFI is on the telescope. And we can take bias/dark before the run? I think my summary was confuging... this is the punch list mainly done "before" the run. |
| Comment by hassan [ 30/Nov/22 ] |
|
Closing as November 2022 (Run 08) completed. |