[INSTRM-1760] Study the convergence of September run Created: 14/Oct/22  Updated: 16/Dec/22  Resolved: 16/Dec/22

Status: Done
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: chyan Assignee: chyan
Resolution: Done Votes: 0
Labels: CanBeClosed, EngRun
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Sprint: preEngRun08Nov

 Description   
  • Compare the convergence before/after updating the cobra geometry
  • Compare two visit ID 80128 and 80484. Those visits are looking the same fields, but two difference results.


 Comments   
Comment by yuki.moritani [ 21/Oct/22 ]

Chi-Hung reported the initial results at PFI telecon on 19-20 October 2022 (PFS-ics:02708).

Comment by yuki.moritani [ 25/Nov/22 ]

Recording: Updated version (see below) of the report was sent to PFS-ics:02718

https://sumire.pbworks.com/w/file/151052388/SepEngRunStudy20220923_CHYan_20221103.pdf

 

Comment by chyan [ 16/Dec/22 ]

This ticket is closed since the report is updated.