[INSTRM-1649] Study the convergence performance changing during June run Created: 21/Jun/22  Updated: 03/Sep/22  Resolved: 03/Sep/22

Status: Done
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: chyan Assignee: chyan
Resolution: Done Votes: 0
Labels: EngRun
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Attachments: PDF File JuneEngRunStudy_20220629.pdf    
Issue Links:
Relates
relates to INSTRM-1534 Define a better convergence criteria Won't Fix
Story Points: 4
Sprint: preEngRun07Sep

 Description   

At June 19th, the fifth engineering run, we found the convergence results get bad during the middle of the night. Then the convergence results becomes better during twilight time. We need to investigating the root cause.



 Comments   
Comment by chyan [ 29/Jul/22 ]

Per discussion last week, the report uploaded.

Comment by hassan [ 29/Jul/22 ]

This ticket will be on hold till new data can be acquired during the Nov 2022 Eng Run. Chi-Hung will file a separate ticket to implement the new convergence strategy involving a variable exposure time for a given iteration.

Comment by hassan [ 20/Aug/22 ]

Latest study is available on PBworks: https://sumire.pbworks.com/w/file/fetch/150131643/JuneEngConvergence-CHYan-20220819.pdf

Comment by chyan [ 25/Aug/22 ]

All related plots are uploaded to here

Comment by hassan [ 03/Sep/22 ]

Closed. Reports have been provided on the convergence performance.

Generated at Sat Feb 10 16:37:56 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.