[INSTRM-1570] Provide pfs_utils routine to finalize pfsDesign positions for a given altitude. Created: 02/Apr/22  Updated: 04/Mar/23  Resolved: 04/Mar/23

Status: Won't Fix
Project: Instrument control development
Component/s: pfs_utils
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: cloomis Assignee: Unassigned
Resolution: Won't Fix Votes: 0
Labels: CanBeClosed
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Relates
relates to INSTRM-1609 Calculate fibre positions in mm just ... Done
relates to INSTRM-1618 update opdb schema to cope with the n... Won't Fix
relates to INSTRM-1569 Have ICC "finalize" pfsDesign on load. Won't Fix
Sprint: PreEngRun05 G, PreEngRun06June

 Description   

Just before observing a pfsDesign, we will know the real telescope altitude, etc. We need a routine which finalizes the positions in a given pfsDesign. It cannot change the SHA, so cannot modify ra/dec assignments.



 Comments   
Comment by yuki.moritani [ 08/Jul/22 ]

As mentioned in INSTRM-1609, there is a routine, putting aside it should be modified or not.

Comment by arnaud.lefur [ 04/Mar/23 ]

duplicate INSTRM-1681

Generated at Sat Feb 10 16:36:58 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.