[INSTRM-1563] Support LAM NIR testing effort Created: 30/Mar/22  Updated: 08/Feb/23

Status: Open
Project: Instrument control development
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: hassan Assignee: cloomis
Resolution: Unresolved Votes: 0
Labels: NIR, SPS
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Blocks
is blocked by INSTRM-1576 Replace existing collection of NIR DA... Open
Relates
relates to INSTRM-1137 handle synchronisation between H4 and... Done
relates to PIPE2D-668 Support ISR processing for NIR data Done
relates to INSTRM-980 provide a hxActor simulator that can ... Done
Sprint: SM1PD-2022 C, 2DDRP-2023 A

 Description   

LAM will receive the first NIR camera for integration and testing in April/May 2022. Please ensure that ICS and DRP can support that effort.

This is a parent ticket. Specific tickets will be linked to this.