[INSTRM-1245] Latch some (at least ENU shutter) header info while integrating Created: 17/Apr/21  Updated: 17/Apr/21

Status: Open
Project: Instrument control development
Component/s: ics_utils
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: cloomis Assignee: cloomis
Resolution: Unresolved Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified


 Description   

Most header info is latched right after wipe has finished and integration started. But note that this is before the shutters are opened and most lamps turned on. We play a game so that we get the commanded lamp states (from DCB and later pfiLamps), but not measured currents. We do not even do that for the shutters: the ENU W_ENSHUT value is always "close"

Think out what we actually want and can safely provide. We want to do this right for bias, 1-second calibration exposures, and "long" exposures.


Generated at Sat Feb 10 16:33:22 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.