[INSTRM-1164] Incorporate DCB collimator change to the beam config date Created: 21/Jan/21  Updated: 29/Jan/21  Resolved: 29/Jan/21

Status: Done
Project: Instrument control development
Component/s: ics_ccdActor, ics_hxActor
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: cloomis Assignee: cloomis
Resolution: Done Votes: 0
Labels: SPS
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Blocks
is blocked by INSTRM-1162 add a command and keyword to declare ... Done
is blocked by INSTRM-1163 Add keyword to indicate DCB collimato... Won't Fix
Story Points: 1

 Description   

Add new DCB collimator change date keyword to W_SBEMDT beam config change date. This would also add a FITS card for the DCB config.



 Comments   
Comment by cloomis [ 29/Jan/21 ]

Our single-date scheme is breaking down a bit. We currently have beamDate = latest(fpaDate, slitDate, gratingDate). Adding the dcbDate(s) would add churn to SMs which are not using a DCB. The spsActor tracks the light source for each SM; this ticket's logic should, I think, only use one of the the dcbDates if a DCB is connected. We are fine with using the single dcbDate for a few more weeks....

Is there something like a sps.smLight=PFI,PFI,DCB2,None key?

Comment by cloomis [ 29/Jan/21 ]

Merged at 72643d2

Generated at Sat Feb 10 16:32:32 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.