[INSTRM-1163] Add keyword to indicate DCB collimator configurations Created: 21/Jan/21  Updated: 29/Jan/21  Resolved: 29/Jan/21

Status: Won't Fix
Project: Instrument control development
Component/s: ics_dcbActor
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Normal
Reporter: cloomis Assignee: arnaud.lefur
Resolution: Won't Fix Votes: 0
Labels: SPS
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Blocks
blocks INSTRM-1164 Incorporate DCB collimator change to ... Done

 Description   

We need a keyword or a few to indicate the DCB collimator configurations. Should include a configuration change date, as was done for the hexapod/fpa moves.

Please do not add a FITS field for the config date – we build a dedicated "beam configuration" section of the header, with all the relevant keys.



 Comments   
Comment by cloomis [ 29/Jan/21 ]

This has been done on INSTRM-1162

Generated at Sat Feb 10 16:32:32 JST 2024 using Jira 8.3.4#803005-sha1:1f96e09b3c60279a408a2ae47be3c745f571388b.