-
Type:
Story
-
Status: Done (View Workflow)
-
Priority:
Normal
-
Resolution: Done
-
Component/s: None
-
Labels:None
-
Epic Link:
Prepare object lists from PDR2 following the selection criteria of each SSP survey components. Pass the lists to Kiyoto Yabe to run ETC (which is a separate ticket).
- blocks
-
SCIDB-94 run ETC for v2.5
-
- Done
-