Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-924

Create calibs and process recent data

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Story Points:
      3
    • Sprint:
      2DDRP-2021 A11

      Description

      Following the addition of engineering fibers (SIM2D-144) and various improvements to detectorMap construction (e.g., PIPE2D-798, PIPE2D-891), create new calibs for SuNSS runs and the recent engineering PFI run, and process sky observations.

      hassan identified the following data:

      For SuNSS exposures, as a start, look at 63350..63369 (29-30 June 2021) and 69039..69177(21-25 Oct 2021). There are no data in between those two dates, unfortunately. I can certainly give you the visits for more data in June later if you need that right now. (edited)

      and

      SuNSS
      m-band: flats=63050..63061, arcs=63102..63106 (roomlights).
      b-band: flats=63050..63061, arcs=63091..63100 (roomlights)
      r-band: flats=46628..46670, arcs=46723..46748 (skylines; supplied by Arnaud)
      PFI
      r-band: flats=68351, arcs=68100
      (that was a limited set for testing. You could possibly could use flats=68345^68350^68351 and for arcs 68096..68100)
      I did not look at b-band PFI data.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                price price
                Reporter:
                price price
                Reviewers:
                hassan
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: