Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-815

Use flux in parallel overscan to determine if a shutter is currently broken

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: ops_pfs
    • Labels:
      None
    • Sprint:
      2DDRP-2021 A 4

      Description

      The SM1 red shutter on Mauna Kea was broken until 2021-04-14, requiring a correction for photons collected during readout.  After the shutter was fixed the book-keeping wasn't updated to let the DRP know (there's a ticket).

      Please add code to check the values in the parallel overscan and guess whether the shutter is broken and act accordingly.

        Attachments

          Activity

            People

            • Assignee:
              rhl rhl
              Reporter:
              rhl rhl
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: